2017 December 10: Assembly (3.50 hours)
Updated:
First entry|Previous entry|Next entry|Last entry
- Installed transmission shift linkage with ball joint rod ends.
- Installed proper length bolts for handlebar risers and fully tightened.
- Shortened a stainless steel bolt to 75 mm for the lower starter mount and installed.
- Set valve clearance.
- Installed intake manifolds.
- Test fit header pipe nuts. Left one is a bit loose and will need to be enlarged to fit properly.
- Removed the old paint from the outside of the original breather. Inside is soaking for more cleaning.