Gregory Bender

2012 December 03: Drop off parts at my machinist (2.00 hours)

Updated:

First entry|Previous entry|Next entry|Last entry


I've been busy with the Thanksgiving Holiday and my inlaws visiting for two weeks...then trying to wrap up an engine rebuild for a customer. I finally got around to pulling together all of the parts I need to have my machinist inspect and service: crankshaft and main bearings, connecting rods, and cylinder heads.

I also dropped off the rear triangular shaped cover from the back of the transmission. As I've done in the past, I'm having the cover machined to accept an o-ring. This will stop oil from leaking out of the shift shaft area (an excellent upgrade).

My bearings arrived in the mail today, too.


First entry|Previous entry|Next entry|Last entry