Gregory Bender

2012 November 03: Frame prep (1.25 hours)

Updated:

First entry|Previous entry|Next entry|Last entry


I chased all the threads in all of the pieces I want to have powder coated. I removed the VIN tag from the frame and then spent some time carefully examining and straightening various pieces on the frame. Nothing major, just the tangs to which other bits are bolted. I also spent some time straightening the center stand.


First entry|Previous entry|Next entry|Last entry