Gregory Bender

2007 November 12: :

Created:

Updated:

First entry|Previous entry|Next entry|Last entry


Rolling finally! Needed a bit of room to work, so moved the lift forward out of the way and slid Barney over a bit. Lifted the rear with two 2x6s and a 1x6 under the center stand. Decided this might not a bad time to install the wiring for the taillight since once the wheel is in place, room to work is tight. Once that was done, I lubed the drive splines with some Permatex 5th Wheel Grease that Bruce Giller gave me. Usually it's a minor battle getting the wheel into place and keeping everything lined up to install the axle. But, this time everything went smoothly and no cussing was needed! :-) Somehow I'm missing one flat washer for the axle, so it's not tightened down yet, but everything else is in place securely.

Photo courtesy of Charlie Mullendore of Antietam Classic Cycle.

Had a few minutes left before I quit for the evening, so made up the spark plug wires and installed them.

Photo courtesy of Charlie Mullendore of Antietam Classic Cycle.


First entry|Previous entry|Next entry|Last entry