2007 August 15: :
Created:
Updated:
First entry|Previous entry|Next entry|Last entry
Cleaned and waxed the swing arm and brake tie rod, then installed the bearings, seals, circlip, etc.
Created:
Updated:
First entry|Previous entry|Next entry|Last entry
Cleaned and waxed the swing arm and brake tie rod, then installed the bearings, seals, circlip, etc.