2010 June 23: Tank, etc (2.00 hours)
Updated:
First entry|Previous entry|Next entry|Last entry
Filled the tank with gas and checked for leaks.
Created two new wire guides (from stainless steel wire) for the front brake lines so that the brake lines wouldn't rub on anything.
Fit the spoilers to the front crash bars.
Zip tied a few cables and wires.
First entry|Previous entry|Next entry|Last entry