2008 May 11: Paint and powder coat clean up (2.00 hours)
Updated:
First entry|Previous entry|Next entry|Last entry
- Painted the other side of the rotors.
- Chased all the threads in the parts that had been powder coated.
- Cleaned up all the over spray in the powder coated parts.
First entry|Previous entry|Next entry|Last entry