2007 February 23: Generator bracket, throttle, hand grips (1.50 hours)
Updated:
First entry|Previous entry|Next entry|Last entry
Zinc plated the base generator bracket and a few other parts.
Assembled generator bracket using new split pins and freshly zinc plated parts.
Assembled throttle using freshly zinc plated hardware.
Mounted hand grips on handlebar and throttle. Covered hand grips with static-cling plastic wrap to protect from my greasy hands.