Gregory Bender

2007 February 19: Assembly (1.25 hours)

Updated:

First entry|Previous entry|Next entry|Last entry


Assembled freshly zinc plated skid plates to oil pan and torqued all bolts.

Fitted freshly zinc plated clamps to carbs complete with correct nuts and bolts.

Identified crack in generator bracket. Seems like an easy repair, reinforcement job. I'll weld it up and zinc plate it again.

Assembled distributor with freshly zinc plated hardware and set the points to 0.17 inch. I made sure to use medium strength thread locking compound on the special shoulder bolts on which the distributor cap retaining spring pivot.


First entry|Previous entry|Next entry|Last entry